11-1-04, 3 pics
original designs,
log package being pre-built on log yard
|

11-15-04, 3 pics
foundation, logs
being pre-built on Tennessee Log Homes Canadian log yard |

1-1-05, 2 pics
logs being
pre-built on TLH Canadian log yard |

1-16-05, 2 pics
completing subfloor
and lower level walls
|

1-20-05, 8 pics
re-erection of
pre-built logs underway at Tamarack jobsite, Sugarloaf Lot 15
|

1-24-05, 7 pics
more logs arrive in
Tamarack
|

2-2-05, 11 pics
log trusses and
purlins set
|

2-9-05, 7 pics
Chimney going up,
roof system framing
|

2-18-05, 9 pics
roof system framing
nearly completed
|

2-25-05, 12 pics
Awesome!!!
|

3-5-05, 5 pics
Fireplace at lower
level and fireplace on main level
|

3-10-05, 9 pics
What a massive
structure this is. New pics show additional log work, fireplaces, arched
doorways, cold roof system and views.
|

3-12-05, 15 pics
Awesome interior
shots. Huge logs over 20-inches in diameter support the heavy snow load at
Tamarack.
|

3-20-05, 9 pics
Interior framing
being started.
|

4-5-05, 10 pics
Deck piers and
lower level stone work looks awesome!
|

4-28-05, 11 pics
The Dunham/Beck
Home will look AWESOME from the slopes!
|

7-27-05 , 14 pics
Almost Done Not too long now!!! |

8-19-05 , 14 pics
Getting Closer |

9-12-05, 15 pics
The interior Is
looking great!!!
|

10-1-05, 1 pic
Check out this
end!!!
|

10-26-05, 20 pics
WOW!!!
|

10-30-05, 13 pics
More of the
interior
|

3-23-06, 3 pics
Exterior Pictures
|

3-27-06, 12 pics
WOW!!
|
|
|
|
|